A kitchen or bathroom only works when the pipes, drains, vents and heating behind the walls are right, and Central Plumbing, Heating & Air Conditioning plans those systems together with the room from the first visit. From its Southampton base, the company has remodeled homes across Bucks County and Montgomery County since 2001, starting every project with a free design visit and a written price.
24+ Years in Business
60-Minute Emergency Response
5-Star Rated on Google
Licensed & Insured in PA
Serving Bucks & Montgomery County
Key Takeaways

A finished walk-in shower in a remodeled bathroom.
What We Cover
One crew looks after design, plumbing, heating, cooling and finishing, so the room and its systems are never planned separately.
Compare Rooms
| Decision | Bathroom remodel | Kitchen remodel |
|---|---|---|
| Biggest plumbing job | Relocating a toilet, shower or tub drain | Relocating a sink with its supply and drain lines |
| Fixtures most often replaced | Shower, tub, toilet, vanity and taps | Sink, faucet and dishwasher connection |
| Heating or cooling change | Heated floors, stronger ventilation | Range ventilation, added cooling zone |
| Best moment to fix hidden problems | Walls open: worn supply lines, slow drains | Floor up: supply lines, drain slope |
| Water saving opportunity | Efficient showerheads, dual-flush toilets | Efficient faucet, leak-free supply lines |
Scope Room By Room
Every room asks different work from plumbing, heating and cooling, so scope is set room by room before a price is given.
| Room | Plumbing work | Heating and cooling work |
|---|---|---|
| Bathroom | New shower, tub, toilet and vanity lines, venting for steam | Heated floor, ventilation, added heat if the room grows |
| Kitchen | Sink, faucet and dishwasher lines, supply and drain reroutes | Range ventilation, extra cooling zone for cooking heat |
| Basement | Bathroom and wet bar rough-in, sump pump test, moisture check | Heating and cooling extended downstairs |
| Whole home | New bathroom and kitchen lines, water heater sized for demand | Furnace, boiler or heat pump sized for the house |
Save Water
With walls already open, a remodel is the best time to end quiet leaks and fit fixtures that use less water.
Old taps, showerheads and toilet valves can leak for years without showing a stain, and a remodel swaps them all at once. WaterSense labeled faucets and showerheads are certified to use less water while working as well as standard models. A water heater for the new bathroom or kitchen should match the household; the EPA WaterSense program and the U.S. Department of Energy water heating guide explain how to judge one.

A remodeled master bathroom.
Household leaks waste over 10,000 gallons of water every year
Typical household leaks: over 10,000 gallons a year
One faucet dripping once a second: over 3,000 gallons a year
Source: EPA WaterSense leak facts. A remodel that changes every old valve and supply line can cut about 10% from a water bill, so savings show in water use as well as looks.

A finished bathroom, glass shower and freestanding tub.
From First Visit
Nothing is demolished until layout, price and permits are settled, so the project runs in order instead of stopping halfway for a decision.
→ Free design visit
→ Layout, fixtures and materials chosen
→ Price and schedule agreed in writing
→ Township permits checked
→ Demolition and rough-in
→ Fixtures, tiling and finishes
→ Final checks, cleanup and warranty.
Before Demolition
→ Layout and fixture positions
→ Fixtures, finishes and materials chosen
→ Permits confirmed
→ Water, gas and power shut-offs located
→ Drain slope and venting checked
→ Demolition begins.
Each choice is cheap to change on paper and costly to change after a wall is open, so all are settled before demolition. A moved fixture is checked first for drain slope and venting, because a drain that cannot fall to the main line will not work in its new spot.
Cost Factors
Two remodels never carry the same price, because the price follows the work, not the room.
The written price from the design visit covers all of these, so nothing extra appears once work starts.
Hidden Problems
Opening a wall often shows trouble invisible from the room, and a remodel is the time to fix it, not cover it.
Never cut into a wall or shift a gas line, drain or load-bearing wall until permits and shut-offs are confirmed. A wrong cut can flood a room or start a gas call.
Design Visit
The visit is free, and it ends with a written price.
Whether you are planning a new bathroom, a kitchen refresh, or a free design visit, Central Plumbing, Heating & Air Conditioning is ready to help.
Call now: 215-322-6884 — Open 24/7
Why Central
One crew carries the room from first sketch to last check, so plumbing, heating and finishing never pass between strangers.
Plumbers and HVAC technicians on staff
A moved boiler, new shower drain or second cooling zone is handled by the same team.
Everything agreed before demolition
Layout, materials, fixtures and price, all in writing.
People checked before they enter the home
Pennsylvania-licensed, insured, factory-trained, background-checked technicians.
Work backed by warranty
A workmanship warranty stands behind each job, and estimates cost nothing.
One team keeps the schedule
One project team coordinates design, plumbing, heating, cooling and finishing, so work never waits on five separate diaries.
Heating and cooling handled by the same team
A remodel touching a furnace, boiler or air conditioner is handled by the people who service those systems daily.
How It Works
1. Call or Request a Quote
Call 215-322-6884 or submit the online form to book a free design visit.
2. Diagnosis & Upfront Estimate
The room is measured, the layout is talked through, and price and schedule are given in writing.
3. Expert Repair or Installation
Demolition and rough-in, then fixtures, tiling and finishes, each phase checked before the next starts.
4. Clean-Up & Follow-Up
Every tap, drain, vent and heater is tested, the room is cleaned, and the warranty is explained.
Permits
When plumbing, electrical work or structure moves, a permit is usually required, and the township at the address decides which one. Permits in both counties come from the township under the Pennsylvania Uniform Construction Code. Central confirms the requirement before booking, and the permit is secured before demolition.
Remodeling work runs across both counties, including Doylestown, Newtown, Horsham, Warminster and Southampton.
Questions
How long does a bathroom remodel take?
It depends on scope. Swapping fixtures in the same layout takes days; a full remodel that moves plumbing takes weeks. The schedule is set in writing at the design visit, so the finish date is known before work begins.
Can a toilet, sink or shower be moved in a remodel?
Yes, in most homes, when the drain run and venting allow it. Waste water only flows downhill, so a fixture moved across the room may need a new drain run. The layout is checked at the design visit.
Do I need a permit for a bathroom or kitchen remodel?
In most cases, yes, when plumbing, electrical work or structure moves. Permits in both counties are issued by the township under the Pennsylvania Uniform Construction Code, and what is required follows the property address. Central confirms the requirement before booking.
What does a remodel cost?
It follows room size, fixtures chosen, how far plumbing moves, heating or cooling changes, and permits. No two remodels are priced the same, so a free estimate comes first and the price is put in writing before work starts. Call 215-322-6884 to arrange one.
Do you handle heating and cooling in a remodel too?
Yes. Added space needs heating and cooling sized for it: a heated floor, an extra zone or a ductless unit. Central sizes the equipment and installs it as part of the same project, using Carrier and Lennox systems.
What happens at the free design visit?
The room is measured, existing plumbing, drains, vents and heating are checked, and the layout is talked through, including where fixtures can move. Fixture and material options are shown, township permit needs are confirmed, and price and schedule are given in writing.
Can a basement be turned into a bathroom or a wet bar?
Yes, when moisture is under control and drains can reach the main line. The basement is checked for damp, the sump pump is tested, and the drain run is planned before any wall goes up. A wet bar needs a supply line and a drain, both roughed in during the same phase.
Will a remodel fix slow drains and old supply lines?
Yes, and a remodel is the best time to do it. With walls and floors open, worn supply lines can be replaced and a slow drain cleared or re-run with the right slope. The drain team checks every drain before the walls close again.
Central Plumbing, Heating & Air Conditioning
950 Industrial Blvd, Southampton, PA 18966
+1 215 322 6884 · help@cmcmail.net
Open 24/7